PRODUCTION CAPABILITY

Capacity is verified by site, product, and production line.

Redhill coordinates supply across three affiliated production sites. We do not present an unverified network total as Redhill-owned capacity. For each program, the proposed legal manufacturer, capable line, realistic monthly output, packaging constraint, and lead time are confirmed before quotation approval.

Why no headline tonnage is shown

The three manufacturers are separate legal entities and may support different products, lines, and schedules. Aggregated capacity becomes meaningful only after duplicate lines, maintenance, existing commitments, packaging bottlenecks, and the selected SKU are accounted for.

Capability portfolio under site-by-site verification

These are the product families coordinated by Redhill. The assigned production entity is disclosed in the buyer due-diligence pack.

Rounded Bentonite Cat Litter

Site assignment verified per inquiry

Clumping Bentonite Cat Litter (Crushed Granules)

Site assignment verified per inquiry

Tofu Cat Litter

Site assignment verified per inquiry

Cassava Cat Litter

Site assignment verified per inquiry

Tofu & Bentonite Blend

Site assignment verified per inquiry

Plant-Based Mixed Cat Litter

Site assignment verified per inquiry

What must be verified before a capacity claim

  1. 01Legal manufacturing entity
  2. 02Physical production address
  3. 03Applicable product and formula
  4. 04Dedicated or shared production line
  5. 05Nameplate versus realistic output
  6. 06Packaging-line throughput
  7. 07Existing order commitments
  8. 08Evidence date and approving owner

How Redhill builds a supply plan

The result is an order-specific capacity position rather than a marketing total.

01

Product fit

Confirm formula, performance target, granule, fragrance, and material requirements.

02

Line and site

Match the SKU to a verified affiliated site and production line.

03

Packaging constraint

Check bag format, artwork, coding, pallet pattern, and packing-line throughput.

04

Schedule

Reserve realistic production, inspection, loading, and sailing windows.

05

Evidence

Record the capability source, date, legal entity, and approval owner in the buyer file.

Ask for product-specific capacity, not a generic total.

Send product, monthly volume, pack sizes, target delivery month, and destination. We will return the proposed site, planning range, constraints, and document checklist.

Request a capacity plan →